Search results

1 – 10 of over 2000
Article
Publication date: 29 March 2022

Jian Lu, Suduo Xue, Renjie Liu and Xiongyan Li

In order to optimize SCSWIRC, the simplification and further optimization method is proposed. SCSWIRC's optimization includes two levels. The first level refers to simplifying…

Abstract

Purpose

In order to optimize SCSWIRC, the simplification and further optimization method is proposed. SCSWIRC's optimization includes two levels. The first level refers to simplifying structural system from the perspective of components; the second level refers to optimizing components' sectional areas from the perspective of mechanics. The first level aims to remove redundant components, and the second level aims to reduce structural self-weight based on the first level. The purpose of the paper is to simplify SCSWIRC's structural system and optimize structural self-weight and reduce construction forming difficulty.

Design/methodology/approach

Grid-jumping layout and multi-objective optimization method is used to simplify and further optimize Spatial cable-truss structure without inner ring cables (SCSWIRC). Grid-jumping layout is used to simplify remove redundant components, and multi-objective optimization method is used to reduce structural self-weight. The detailed solving process is given based on grid-jumping layout and multi-objective optimization method.

Findings

Take SCSWIRC with a span of 100m as an example to verify the feasibility and correctness of the simplification and further optimization method. The optimization results show that 12 redundant components are removed and the self-weight reduces by 3.128t from original scheme to grid-jumping layout scheme 1. The self-weight reduces from 36.007t to 28.231t and feasible coefficient decreases from 1.0 to 0.627 from grid-jumping layout scheme 1 to multi-objective optimization scheme. The simplification and further optimization can not only remove the redundant components and simplify structural system to reduce construction forming difficulty, but also optimize structural self-weight under considering structural stiffness to reduce project costs.

Originality/value

The proposed method firstly simplifies SCSWIRC and then optimizes the simplified SCSWIRC, which can solve the optimization problem from the perspective of components and mechanics. Meanwhile, the optimal section solving method can be used to obtain circular steel tube size with the optimal stiffness of the same areas. The proposed method successfully solves the problem of construction forming and project cost, which promotes the application of SCSWIRC in practical engineering.

Article
Publication date: 10 July 2017

Guotao Zhang, Yanguo Yin, Lu Xue, Guoqian Zhu and Ming Tian

The purpose of this paper is to discuss the combined effects of the deterministic surface roughness and porous structure on the lubrication property of the multi-layer bearing.

Abstract

Purpose

The purpose of this paper is to discuss the combined effects of the deterministic surface roughness and porous structure on the lubrication property of the multi-layer bearing.

Design/methodology/approach

Digital filtering technique and Kozeny-Carman equation are used to simulate the random Gauss surface and the internal pore structure of the porous bearing, respectively. Effects of surface morphology, structure and pores on the lubrication property are discussed by using the finite difference method.

Findings

Results show that the lubrication performance of the multi-layer bearing increased with the increase of the surface roughness. Also, the transverse surface is better than that of the longitudinal surface. Moreover, lubricating property is getting worse with the increase of the height of each layer and the porosity. The lower permeability surface is beneficial to improve the lubrication performance when the total porosity is certain.

Originality/value

The effect of the Gauss roughness parameters on the detail of lubrication performance are analysed, such as the migration of the oil film rupture point position, the expansion of the pressure distribution region and the fluctuation of the pressure distribution curve with the roughness parameters. The combined effects of surface roughness, multi-layer structure and the internal pore parameters on the hydrodynamic behaviours of multi-layer porous bearing are analysed. This work is beneficial for the analysis of the tribological property and the structural design of multi-layer bearing.

Details

Industrial Lubrication and Tribology, vol. 69 no. 4
Type: Research Article
ISSN: 0036-8792

Keywords

Article
Publication date: 14 November 2023

Xin Li, Siwei Wang, Xue Lu and Fei Guo

This paper aims to explore the impact of green finance on the heterogeneity of enterprise green technology innovation and the underlying mechanism between them.

Abstract

Purpose

This paper aims to explore the impact of green finance on the heterogeneity of enterprise green technology innovation and the underlying mechanism between them.

Design/methodology/approach

Using the data of China's A-share listed enterprises from 2008 to 2020 and the fixed effect model, the authors empirically explore the relationship and mechanism between green finance and green technology innovation by constructing the green finance index while considering both the quality and quantity of innovation.

Findings

The study suggests that green finance is positively related to the quality and quantity of enterprise green technology innovation, while green finance is more effective in stimulating the quality of green technology innovation than quantity. In addition, alleviating financial mismatch and improving the quality of environmental information disclosure are core mechanisms during the process of green finance facilitating green technology innovation. Furthermore, green finance exerts a more positive effect on the quality and quantity of green technology innovation with large-size enterprises, heavily polluting industries and enterprises in the eastern region.

Originality/value

This paper enriches the literature on green finance and green technology innovation and provides practical significance for green finance implementation.

Details

European Journal of Innovation Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1460-1060

Keywords

Article
Publication date: 30 June 2022

Amer A. Hijazi, Srinath Perera, Rodrigo N. Calheiros and Ali Alashwal

Despite a large amount of BIM data at the handover stage, it is still difficult to identify and effectively isolate valuable construction supply chain (CSC) data that need to be…

Abstract

Purpose

Despite a large amount of BIM data at the handover stage, it is still difficult to identify and effectively isolate valuable construction supply chain (CSC) data that need to be reliably handed over for operation. Moreover, the role of reconciling disparate data is usually played by one party. The integration of blockchain and BIM is a plausible framework for building a reliable digital asset lifecycle. This paper proposes a BIM single source of truth (BIMSSoT) data model using blockchain for ensuring a reliable CSC data delivery.

Design/methodology/approach

This paper utilises a blended methodology, the foundation of which is ingrained in business and management research with elements of information and communication technology (ICT) research wherever required. Knowledge elicitation case studies utilising novel interventions such as a data flow diagram (DFD), taxonomy and entity-relationship diagram (ERD) were used in this paper to develop the BIMSSoT data model. The model was validated using an expert forum, and its technological feasibility was established by developing a proof of concept.

Findings

The practical contribution of this research leads to the progression of BIM towards digital engineering to go beyond object-based 3D modelling by building structured and reliable datasets, transitioning from project-centric records to a digital ecosystem of linked databases by utilizing blockchain's potential for ensuring trusted data.

Originality/value

To the best of the author's knowledge, prior to this paper, no research had investigated a detailed data model development leveraging blockchain and BIM to integrate an immutable and complete record of CSC data as another dimension of BIM for operations.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 14 September 2023

Jiyang Yu, Hua Zhong and Marzia Bolpagni

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering…

Abstract

Purpose

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering, Construction and Operations (AECO) industry as a means of identifying gaps between the existing paradigm and practical applications for determining future research directions and improving the industry. The study aims to provide clear guidance on areas that need attention for further research and funding and to draw academic attention to factors beyond the technical dimension.

Design/methodology/approach

A mixed-method systematic review is used, considering multiple literature types and using a sociotechnical perspective-based framework that covers three dimensions (technic, process and context) and three research elements (why, what and how). Data are retrieved and analysed from the Web of Science and Scopus databases for the 2017–2023 period.

Findings

While blockchain has the potential to address security, traceability and transparency and complement the system by integrating supporting applications, significant gaps still exist between these potentials and widespread industry adoption. Current limitations and further research needs are identified, including designing fully integrated prototypes, empirical research to identify operational processes, testing and analysing operational-level models or applications and developing and applying a technology acceptance model for the integration paradigm. Previous research lacks contextual settings, real-world tests or empirical investigations and is primarily conceptual.

Originality/value

This paper provides a comprehensive, critical systematic review of the integration of blockchain with BIM in the construction industry, using a sociotechnical perspective-based framework which can be applied in future reviews. The study provides insight into the current state and future opportunities for policymakers and practitioners in the AECO industry to prepare for the transition in this disruptive paradigm. It also provides a phased plan along with a clear direction for the transition to more advanced applications.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 1 April 2024

Frank Ato Ghansah

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the…

Abstract

Purpose

Despite the opportunities of digital twins (DTs) for smart buildings, limited research has been conducted regarding the facility management stage, and this is explained by the high complexity of accurately representing and modelling the physics behind the DTs process. This study thus organises and consolidates the fragmented literature on DTs implementation for smart buildings at the facility management stage by exploring the enablers, applications and challenges and examining the interrelationships amongst them.

Design/methodology/approach

A systematic literature review approach is adopted to analyse and synthesise the existing literature relating to the subject topic.

Findings

The study revealed six main categories of enablers of DTs for smart building at the facility management stage, namely perception technologies, network technologies, storage technologies, application technologies, knowledge-building and design processes. Three substantial categories of DTs application for smart buildings were revealed at the facility management stage: efficient operation and service monitoring, efficient building energy management and effective smart building maintenance. Subsequently, the top four major challenges were identified as being “lack of a systematic and comprehensive reference model”, “real-time data integration”, “the complexity and uncertainty nature of real-time data” and “real-time data visualisation”. An integrative framework is finally proposed by examining the interactive relationship amongst the enablers, the applications and the challenges.

Practical implications

The findings could guide facility managers/engineers to fairly understand the enablers, applications and challenges when DTs are being implemented to improve smart building performance and achieve user satisfaction at the facility management stage.

Originality/value

This study contributes to the knowledge body on DTs by extending the scope of the existing studies to identify the enablers and applications of DTs for smart buildings at the facility management stage and the specific challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 5 December 2023

Atul Kumar Singh and V.R. Prasath Kumar

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building…

Abstract

Purpose

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building information modeling (BEBIM) in FM. This research aims to identify and prioritize the barriers to adopting BEBIM in FM.

Design/methodology/approach

To address the knowledge gap, this study employs a two-phase methodology for evaluating the barriers to adopting BEBIM in FM. The first phase involves a comprehensive literature review identifying 14 barriers to BEBIM adoption. Using a Delphi approach, the identified barriers were categorized into 6 groups and finalized by 11 experts, adding 3 more barriers to the list. The best-worst method (BWM) determines the priority weights of identified barriers and sub-barriers in the second phase.

Findings

This study reveals that adopting BEBIM for FM in India faces significant hurdles. The most critical barriers are “limited collaboration” and “communication among stakeholders,” “legal constraints in certain jurisdictions” and “challenges in establishing trust and governance models.” To mitigate these barriers, stakeholders should foster collaboration and communication, develop efficient blockchain technology (BT) and establish a trust and governance model.

Practical implications

This work underscores the importance of formulating effective strategies to overcome the identified barriers and emphasizes implications that can assist policymakers and industry stakeholders in achieving successful BEBIM adoption for improved FM practice.

Originality/value

The study provides valuable insights for policymakers, construction industry stakeholders and facility managers interested in leveraging this technology to improve the efficiency and effectiveness of FM practice in India.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 August 2022

Kavitha V.S. and Mohammed Firoz C.

Rapid urbanization and development of pilgrimage cities cause significant problems for the environment and society, leading to long-term challenges. Despite several discussions on…

Abstract

Purpose

Rapid urbanization and development of pilgrimage cities cause significant problems for the environment and society, leading to long-term challenges. Despite several discussions on city sustainability, the literature does not address some of the specific problems of pilgrimage cities. Hence, this study attempts at developing a method to examine the growth pattern and sustainability of pilgrimage cities in southern part of India.

Design/methodology/approach

The benchmarking method and the social, economic and environmental dimensions of sustainability are considered to construct the Pilgrimage City Sustainability Index (PCSI). Appropriate variables and categories are identified through a literature review and expert opinion survey. The benchmark values of the variables are derived by contemplating the pilgrimage cities of Tamil Nadu, one of the states with the largest tourist arrivals in India. Subsequently, three prominent pilgrimage cities from Tamil Nadu were chosen for the case study and the method was tested.

Findings

The result reveals that the cities investigated are performing above average in the sustainability index, with slight variations in their dimension scores. While the category scores of cities assist in identifying macro-level issues, the variable scores provide an insight into micro-level issues. Furthermore, the gap analysis between the benchmark and the present value of each variable discloses the immediate area of attention in each city. Thus, the cities could set more specific targets, frame strategies and/or collaborate with matching cities to bridge these gaps.

Social implications

This index assessment provides a comparison of the pros and cons of these pilgrimage cities and helps identify their demand and supply. Policymakers can find appropriate tools and approaches that aid in sustainable urban development and tourism management.

Originality/value

To the best of our knowledge, this is the first study in emphasizing the application of the benchmarking method to assess the sustainability of Indian pilgrimage sites. With appropriate modifications, this method can be used in varied contexts across the globe.

Details

Benchmarking: An International Journal, vol. 30 no. 9
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 12 September 2022

Hossein Omrany, Amirhosein Ghaffarianhoseini, Ali Ghaffarianhoseini and Derek John Clements-Croome

This paper critically analysed 195 articles with the objectives of providing a clear understanding of the current City Information Modelling (CIM) implementations, identifying the…

Abstract

Purpose

This paper critically analysed 195 articles with the objectives of providing a clear understanding of the current City Information Modelling (CIM) implementations, identifying the main challenges hampering the uptake of CIM and providing recommendations for the future development of CIM.

Design/methodology/approach

This paper adopts the PRISMA method in order to perform the systematic literature review.

Findings

The results identified nine domains of CIM implementation including (1) natural disaster management, (2) urban building energy modelling, (3) urban facility management, (4) urban infrastructure management, (5) land administration systems, (6) improvement of urban microclimates, (7) development of digital twin and smart cities, (8) improvement of social engagement and (9) urban landscaping design. Further, eight challenges were identified that hinder the widespread employment of CIM including (1) reluctance towards CIM application, (2) data quality, (3) computing resources and storage inefficiency, (4) data integration between BIM and GIS and interoperability, (5) establishing a standardised workflow for CIM implementation, (6) synergy between all parties involved, (7) cybersecurity and intellectual property and (8) data management.

Originality/value

This is the first paper of its kind that provides a holistic understanding of the current implementation of CIM. The outcomes will benefit multiple target groups. First, urban planners and designers will be supplied with a status-quo understanding of CIM implementations. Second, this research introduces possibilities of CIM deployment for the governance of cities; hence the outcomes can be useful for policymakers. Lastly, the scientific community can use the findings of this study as a reference point to gain a comprehensive understanding of the field and contribute to the future development of CIM.

Details

Smart and Sustainable Built Environment, vol. 12 no. 5
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 20 September 2022

Fernando Gimeno-Arias and José Manuel Santos-Jaén

Within the fast-moving consumer goods (FMCG) supply chain, one of the problems facing the distribution channel strategy is the presence of the gray market. The article shows two…

Abstract

Purpose

Within the fast-moving consumer goods (FMCG) supply chain, one of the problems facing the distribution channel strategy is the presence of the gray market. The article shows two novel antecedents of the participation of official distributors in this gray channel: Negative impact on distributor performance and the relationship with their supplier. Knowledge of this background helps to preserve the strategy outlined for the official distribution channel.

Design/methodology/approach

Data were collected from 172 Spanish wholesale distributors and analyzed using PLS-SEM.

Findings

The authors found that the damage through negative affectation in the official distributor's performance and the cooperation provided by the manufacturer, have different effects. While affectation is shown to be a powerful antecedent of participation in the gray market, the effect of perceived manufacturer cooperation does not show strong results.

Practical implications

In business practice, these findings lead the manufacturer to keep transactions carried out in the gray market at low levels and provide cooperation to official distributors to guarantee the official channel strategy aimed at efficiency in the distribution of branded goods.

Originality/value

The background of the gray market discussed in the study has not been previously analyzed in the literature. In this way, the authors contribute to the knowledge of such a common problem as the presence of the gray market in the segmentation of distribution channels of high-demand products.

Details

International Journal of Physical Distribution & Logistics Management, vol. 53 no. 7/8
Type: Research Article
ISSN: 0960-0035

Keywords

1 – 10 of over 2000